“Field Review Report” is only for general conformance of the plans/project(s) and specifications.
Comments or corrections made on during field review do not relieve Owner/Builder/Contractor from compliance with the requirements of the plans/project(s) and specifications.
All field review will be performed as per “Quality Management Guidelines” published by Engineers & Geoscientists in British Columbia (EGBC).
The file can be downloaded from “SB Files” by clicking:
All deficiencies identified during the field review, will be reported to the owner/builder and must be repaired, fixed, corrected, and installed as per field review report/instructions.
Some small deficiencies can be verified by pictures, documents, repair details, shop-drawing without re-visiting, but this is not the case all the time.
Being determined solely by SB\Eng, re-visiting field review for additional inspection and verification will be charged ($200 + GST).
Please make sure the followings:
Frost Protection Depth.
Dimension and Size of Foundation Wall
All Isolated Footings (Pad Footings)’ Dimension such as Length and Depth.
Centered-Foundation Walls on the Foundation.
All Hold-Downs, Hardware, Inserts, Bracing Template if required
TO SEND FILES AND MAKE A SCHEDULE
To send your project files, drawings, specification, project requirements, and/or shop drawing, please use following button or email your files to sbengineeingca@gmail.com
24-hours notice required for scheduling.
The fee will be waived if qualified.
If urgent, call SB\ENG for prompt scheduling.
12-hours cancellation notice required.
Appointment time may be delayed due to traffic condition.